Insulation is dedicated to the local processing of rubber insulation pieces of plastic, the plastic acid, alkali, temperature, peelable and good recyclability. Operation process is as follows.
(1) brushing. Before first use of black viscous gel with toluene transferred to the appropriate viscosity, and then brushing with a brush, brushing after every 60 ~ 80 ℃ temperature drying 20 ~ 30min (natural drying can be), dried and then coated , which normally takes 3 to 4 times painted.
(2) dressing. Carefully with a knife to repair parts of the excess over the insulation resin.
The adhesive toughness, more difficult to cut when trimming, be careful, when you pull up and prevent the impact of cutting-edge insulation.
(3) after removal of anodizing. The adhesive strip can be good, stripped down the plastic after washing, drying, dissolved by the toluene recycled for reuse.